|
Date |
|
Component |
|
Condition |
|
Description |
|
13-Nov-2023 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 13-Nov-2023 |
|
17-Oct-2023 |
|
Mark |
|
Reliably Placed |
|
Continuously operating GNSS station or CORS site. Mark is unable to be physically occupied. Horizontal reference point is the centre of 5/8ö thread. The vertical reference is the plate at top of pillar. 0.055m spacer is between GNSS antenna reference point (ARP) and vertical reference plate (antenna height). For more information see http://www.linz.govt.nz/positionz |
|
31-Jul-2023 |
|
Mark |
|
Reliably Placed |
|
|
|
05-Apr-2022 |
|
Mark |
|
Reliably Placed |
|
|
|
17-Mar-2022 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 17-Mar-2022 |
|
17-Mar-2022 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 17-Mar-2022 |
|
16-Mar-2022 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 16-Mar-2022 |
|
23-Oct-2021 |
|
Mark |
|
Reliably Placed |
|
|
|
26-Jan-2021 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 26-Jan-2021 |
|
25-Jan-2021 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 25-Jan-2021 |
|
04-Feb-2019 |
|
Mark |
|
Not Specified |
|
Pillar. |
|
04-Oct-2018 |
|
Mark |
|
Reliably Placed |
|
|
|
11-Jul-2018 |
|
Mark |
|
Reliably Placed |
|
|
|
31-Jan-2018 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 31-Jan-2018 |
|
31-Jan-2018 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 31-Jan-2018 |
|
31-Jan-2018 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 31-Jan-2018 |
|
31-Jan-2018 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 31-Jan-2018 |
|
31-Jan-2018 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 31-Jan-2018 |
|
14-Dec-2017 |
|
Mark |
|
Reliably Placed |
|
|
|
28-May-2016 |
|
Mark |
|
Reliably Placed |
|
|
|
30-Mar-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 30-Mar-2016 |
|
30-Mar-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 30-Mar-2016 |
|
30-Mar-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 30-Mar-2016 |
|
30-Mar-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 30-Mar-2016 |
|
30-Mar-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 30-Mar-2016 |
|
03-Feb-2015 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 3-Feb-2015 |
|
15-May-2014 |
|
Mark |
|
Reliably Placed |
|
|
|
18-Apr-2014 |
|
Mark |
|
Reliably Placed |
|
|
|
25-Feb-2014 |
|
Mark |
|
Reliably Placed |
|
|
|
04-Nov-2013 |
|
Mark |
|
Reliably Placed |
|
Stainless steel bolt with 5/8 thead in centre of 100mm diameter stainless steel plate set central in top of 300mm diameter concrete pillar. |
|
02-May-2013 |
|
Mark |
|
Reliably Placed |
|
None |
|
02-May-2013 |
|
Mark |
|
Reliably Placed |
|
None |
|
02-May-2013 |
|
Mark |
|
Reliably Placed |
|
None |
|
02-May-2013 |
|
Mark |
|
Reliably Placed |
|
None |
|
02-May-2013 |
|
Mark |
|
Reliably Placed |
|
None |
|
02-May-2013 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 2-May-2013 |
|
02-May-2013 |
|
Beacon |
|
Not Specified |
|
None |
|
02-May-2013 |
|
Beacon |
|
Not Specified |
|
None |
|
02-May-2013 |
|
Protection |
|
Not Specified |
|
None |
|
02-May-2013 |
|
Protection |
|
Not Specified |
|
None |
|
03-Jan-2013 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 3-Jan-2013 |
|
17-Dec-2012 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 17-Dec-2012 |
|
16-Feb-2012 |
|
Mark |
|
Reliably Placed |
|
|
|
16-Dec-2011 |
|
Mark |
|
Reliably Placed |
|
|
|
31-Mar-2011 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 31-Mar-2011 |
|
17-Mar-2011 |
|
Mark |
|
Reliably Placed |
|
|
|
16-Dec-2010 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 16-Dec-2010 |
|
18-Nov-2010 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 18-Nov-2010 |
|
18-Oct-2010 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 18-Oct-2010 |
|
22-Sep-2010 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 22-Sep-2010 |
|
22-Sep-2010 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 22-Sep-2010 |
|
26-Aug-2010 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 26-Aug-2010 |
|
15-Mar-2010 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Mar-2010 |
|
09-Dec-2009 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 9-Dec-2009 |
|
09-Dec-2009 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 9-Dec-2009 |
|
09-Dec-2009 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 9-Dec-2009 |
|
09-Dec-2009 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 9-Dec-2009 |
|
14-Oct-2009 |
|
Mark |
|
Reliably Placed |
|
Stainless steel bolt with 5/8 thead in centre of 100mm diameter stainless steel plate set central in top of 300mm diameter concrete pillar. |
|
15-Jun-2009 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Jun-2009 |
|
15-Jun-2009 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Jun-2009 |
|
01-Jan-2009 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 1-Jan-2009 |
|
29-Jul-2008 |
|
Mark |
|
Reliably Placed |
|
|
|
13-Dec-2007 |
|
Mark |
|
Reliably Placed |
|
|
|
12-Oct-2007 |
|
Mark |
|
Reliably Placed |
|
|
|
15-Aug-2007 |
|
Mark |
|
Reliably Placed |
|
|
|
15-Jul-2007 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Jul-2007 |
|
14-Dec-2006 |
|
Mark |
|
Reliably Placed |
|
|
|
14-Nov-2006 |
|
Mark |
|
Reliably Placed |
|
No maintenance required |
|
14-Nov-2006 |
|
Beacon |
|
Not Specified |
|
No maintenance required |
|
14-Nov-2006 |
|
Protection |
|
Not Specified |
|
No maintenance required |
|
01-May-2006 |
|
Mark |
|
Reliably Placed |
|
(TAUP) |
|
01-Aug-2005 |
|
Mark |
|
Reliably Placed |
|
|
|
01-May-2005 |
|
Mark |
|
Reliably Placed |
|
(TAUP) |
|
15-Apr-2005 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Apr-2005 |
|
05-Jan-2005 |
|
Mark |
|
Reliably Placed |
|
|
|
15-Dec-2004 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Dec-2004 |
|
02-Apr-2004 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 2-Apr-2004 |
|
15-Jan-2004 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Jan-2004 |
|
22-Dec-2002 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 22-Dec-2002 |
|
31-Oct-2002 |
|
Mark |
|
Not Specified |
|
|
|
23-Jun-2002 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 23-Jun-2002 |
|
19-Jun-2002 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 19-Jun-2002 |
|
18-Jun-2002 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 18-Jun-2002 |
|
23-Jan-2002 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 23-Jan-2002 |