|
Date |
|
Component |
|
Condition |
|
Description |
|
16-Feb-2024 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 16-Feb-2024 |
|
27-Oct-2022 |
|
Mark |
|
Reliably Placed |
|
|
|
18-Jan-2022 |
|
Mark |
|
Reliably Placed |
|
|
|
24-Jun-2021 |
|
Mark |
|
Reliably Placed |
|
Continuously operating GNSS station or CORS site. Mark is unable to be physically occupied. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF). Horizontal reference point is the centre of 5/8ö thread. The vertical reference is the plate at top of pillar. 0.055m spacer is between GNSS antenna reference point (ARP) and vertical reference plate (antenna height). For more information see http://www.linz.govt.nz/positionz |
|
11-Jun-2021 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 11-Jun-2021 |
|
11-Jun-2021 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 11-Jun-2021 |
|
02-Jun-2021 |
|
Mark |
|
Reliably Placed |
|
|
|
05-May-2021 |
|
Mark |
|
Not Specified |
|
|
|
25-Feb-2021 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 25-Feb-2021 |
|
29-Oct-2019 |
|
Mark |
|
Reliably Placed |
|
|
|
04-Jul-2019 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 4-Jul-2019 |
|
20-Jun-2019 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 20-Jun-2019 |
|
14-Jun-2019 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 14-Jun-2019 |
|
10-Jun-2019 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 10-Jun-2019 |
|
18-Mar-2019 |
|
Mark |
|
Reliably Placed |
|
|
|
16-Mar-2019 |
|
Mark |
|
Reliably Placed |
|
Continuously operating GNSS station or CORS site. Mark is unable to be physically occupied. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF). Horizontal reference point is the centre of 5/8ö thread. The vertical reference is the plate at top of pillar. 0.055m spacer is between GNSS antenna reference point (ARP) and vertical reference plate (antenna height). For more information see http://www.linz.govt.nz/positionz |
|
07-Feb-2018 |
|
Mark |
|
Reliably Placed |
|
|
|
15-Nov-2017 |
|
Mark |
|
Reliably Placed |
|
Continuously operating GNSS station or CORS site. Mark is unable to be physically occupied. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF). Horizontal reference point is the centre of 5/8ö thread. The vertical reference |
|
27-Feb-2017 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 27-Feb-2017 |
|
27-Feb-2017 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 27-Feb-2017 |
|
27-Feb-2017 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 27-Feb-2017 |
|
16-Feb-2017 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 16-Feb-2017 |
|
19-Jan-2017 |
|
Mark |
|
Reliably Placed |
|
Continuously operating GNSS station or CORS site. Mark is unable to be physically occupied. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF). Horizontal reference point is the centre of 5/8" thread. The vertical reference is the plate at top of pillar. 0.055m spacer is between GNSS antenna reference point (ARP) and vertical reference plate (antenna height). For more information see http://www.linz.govt.nz/positionz |
|
26-Oct-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 26-Oct-2016 |
|
26-Oct-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 26-Oct-2016 |
|
26-Oct-2016 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 26-Oct-2016 |
|
14-Sep-2016 |
|
Mark |
|
Not Specified |
|
|
|
28-Jul-2015 |
|
Mark |
|
Reliably Placed |
|
Continuously operating GNSS station or CORS site. Mark is unable to be physically occupied. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF). Horizontal reference point is the centre of 5/8ö thread. The vertical reference |
|
07-Oct-2014 |
|
Mark |
|
Not Specified |
|
|
|
20-Jun-2014 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
17-Jun-2014 |
|
Mark |
|
Reliably Placed |
|
|
|
30-Apr-2014 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
02-Apr-2014 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level |
|
24-Jan-2013 |
|
Mark |
|
Reliably Placed |
|
|
|
24-Jan-2013 |
|
Mark |
|
Reliably Placed |
|
|
|
11-Dec-2012 |
|
Mark |
|
Reliably Placed |
|
None |
|
11-Dec-2012 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 11-Dec-2012 |
|
11-Dec-2012 |
|
Mark |
|
Reliably Placed |
|
None |
|
11-Dec-2012 |
|
Mark |
|
Reliably Placed |
|
None |
|
11-Dec-2012 |
|
Mark |
|
Reliably Placed |
|
None |
|
11-Dec-2012 |
|
Mark |
|
Reliably Placed |
|
None |
|
11-Dec-2012 |
|
Beacon |
|
Not Specified |
|
None |
|
11-Dec-2012 |
|
Beacon |
|
Not Specified |
|
None |
|
11-Dec-2012 |
|
Protection |
|
Not Specified |
|
None |
|
11-Dec-2012 |
|
Protection |
|
Not Specified |
|
None |
|
10-Sep-2012 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
04-Jul-2012 |
|
Mark |
|
Not Specified |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
30-Jun-2012 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
17-Apr-2012 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 17-Apr-2012 |
|
13-Apr-2012 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 13-Apr-2012 |
|
26-Mar-2012 |
|
Mark |
|
Reliably Placed |
|
|
|
26-Mar-2012 |
|
Mark |
|
Reliably Placed |
|
|
|
06-Mar-2012 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 6-Mar-2012 |
|
28-Jan-2012 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 28-Jan-2012 |
|
05-Sep-2011 |
|
Mark |
|
Reliably Placed |
|
|
|
08-Aug-2011 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
02-Aug-2011 |
|
Mark |
|
Reliably Placed |
|
|
|
05-Mar-2011 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 5-Mar-2011 |
|
13-Oct-2010 |
|
Mark |
|
Reliably Placed |
|
|
|
11-Oct-2010 |
|
Mark |
|
Reliably Placed |
|
|
|
09-Dec-2009 |
|
Mark |
|
Reliably Placed |
|
|
|
08-Jul-2009 |
|
Mark |
|
Reliably Placed |
|
|
|
09-Oct-2008 |
|
Mark |
|
Reliably Placed |
|
|
|
05-Apr-2008 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
03-Oct-2007 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
24-Sep-2007 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
28-Aug-2007 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
14-Aug-2007 |
|
Mark |
|
Reliably Placed |
|
|
|
03-Apr-2007 |
|
Mark |
|
Reliably Placed |
|
5/8 whitworth threaded stainless steel bolt in in centre of 100 mm diameter stainless steel plate set in 0.38 m dia diameter concrete pillar 1.54 m above ground level. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
27-Mar-2007 |
|
Mark |
|
Reliably Placed |
|
No maintenance required |
|
27-Mar-2007 |
|
Mark |
|
Reliably Placed |
|
No maintenance required |
|
27-Mar-2007 |
|
Mark |
|
Reliably Placed |
|
No maintenance required |
|
27-Mar-2007 |
|
Mark |
|
Reliably Placed |
|
No maintenance required |
|
27-Mar-2007 |
|
Beacon |
|
Not Specified |
|
Wrapped pvc tape around flexible perishing plastic cable cover |
|
27-Mar-2007 |
|
Protection |
|
Not Specified |
|
No maintenance required |
|
12-May-2006 |
|
Mark |
|
Reliably Placed |
|
|
|
13-Apr-2006 |
|
Mark |
|
Reliably Placed |
|
5/8 thread in centre of 100 mm diameter stainless steel plate set in 400 mm diameter concrete pillar. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
26-Oct-2005 |
|
Mark |
|
Reliably Placed |
|
|
|
12-Sep-2005 |
|
Mark |
|
Reliably Placed |
|
|
|
06-May-2005 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 6-May-2005 |
|
08-Apr-2005 |
|
Mark |
|
Reliably Placed |
|
5/8 thread in centre of 100 mm diameter stainless steel plate set in 400 mm diameter concrete pillar. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
05-Apr-2005 |
|
Mark |
|
Reliably Placed |
|
5/8 thread in centre of 100 mm diameter stainless steel plate set in 400 mm diameter concrete pillar. Pillar plate is 1561 mm above the top of previous mark (German Hill - B1BF) |
|
11-Nov-2004 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 11-Nov-2004 |
|
01-Oct-2004 |
|
Mark |
|
Reliably Placed |
|
Trig German Hill No. 2 - NPLY - Pillar with pin |
|
01-Jul-2004 |
|
Mark |
|
Reliably Placed |
|
|
|
01-Mar-2004 |
|
Mark |
|
Reliably Placed |
|
|
|
15-Jan-2004 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 15-Jan-2004 |
|
01-Nov-2003 |
|
Mark |
|
Reliably Placed |
|
(NPLY) |
|
01-Sep-2003 |
|
Mark |
|
Reliably Placed |
|
|
|
01-Aug-2003 |
|
Mark |
|
Reliably Placed |
|
|
|
01-May-2003 |
|
Mark |
|
Reliably Placed |
|
|
|
18-Jun-2002 |
|
Mark |
|
Reliably Placed |
|
Surveyed on 18-Jun-2002 |